GEREGU (Phase II) – 434 MW Power Plant (3 X GAS TURBINE)

Sector:

Industrial, Water, Power

Client:

SIEMENS

Project Date:

2011 – May, 2013

Service:
  • BoP – Piping Erection works of 3units of gas turbine, generator, air intake system, exhaust system, and raw water tank for 434MW Gas Turbine power plant.
  • Mechanical Erections of 3units of gas turbine, generator, air intake system, exhaust system, and raw water tank for 434MW Gas Turbine power plant.
  • Structural Steel and Cladding Erection Works for 3units of gas turbine building, generator building, air intake system, and exhaust system for 434MW Gas Turbine power