Geregu (Phase 1) 414MW – Gas Turbine Power Plant

Sector:

Industrial, Water, Power

Client:

SIEMENS

Project Date:

2005 –2008

Service:
  • Mechanical Erections of gas turbine and generator
  • Air intake system
  • Raw water tank fabrication.
  • BOP Installation – Cooling Water System
  • BOP Installation – Lube Oil System
  • Exhaust Stack Assembly