Sector:
Client:
BUA Group
Project Date:
2017-Date
Service:
Engineering, Construction/Installation Of 1x Siemens SGT 700 (28MW) For Power Plant Extension At Edo Cement Plant (Line 2 Project) Ukpella
- Design of BoP Equip / Piping / Gantry
- Mech Erection Works
- (BoP Equipment / Piping Works)
- Electrical Installation Works
- (MV / LV/ Signal & Control Cable Works
- Fabrication & Installation of Cable Race Way & Pipe Rack
- Commissioning Support etc.
